Projects

Megawatts on the ground, not on a slide deck.

A selection of plants we have designed, built and connected. Each one is available for a site visit — we would rather you walk a row of our modules than read about them.

0 MW+

Solar capacity delivered

0+

Projects commissioned

0.0M t

CO₂ offset every year

0.0%

Fleet uptime under O&M

2025

180 MWp

Utility-scale · Tracker

Thar Solar Park

Bikaner, Rajasthan

  • 412,000 bifacial modules on single-axis trackers
  • 220 kV pooling substation built in 11 months
  • P50 yield of 1,842 kWh/kWp/year
2024

75 MWp

Utility-scale · Fixed tilt

Anantapur Ground Mount

Anantapur, Andhra Pradesh

  • Commissioned six weeks ahead of schedule
  • Agrivoltaic corridors for local farming
  • 33/220 kV evacuation to the state grid
2025

12.4 MWp

C&I rooftop

Chakan Logistics Hub

Chakan, Maharashtra

  • Largest single-roof array in the district
  • Zero production downtime during install
  • Grid power spend cut by roughly two thirds
2024

28 MWp

Group captive · Open access

Coimbatore Textile Cluster

Coimbatore, Tamil Nadu

  • Nine mills served under one captive SPV
  • Fixed landed tariff locked for 25 years
  • Wheeled through the state utility network
2026

60 MWp + 40 MWh

Solar + storage

Kutch Hybrid Phase I

Bhuj, Gujarat

  • LFP BESS for evening peak dispatch
  • Round-the-clock supply profile
  • Cyclone-rated Class-3 structures
2023

9.8 MWp

C&I ground mount

Nashik Agro Park

Nashik, Maharashtra

  • Cold-chain facility fully solarised
  • Robotic cleaning across all rows
  • Operating above 99% availability
Client voices

What owners say after handover

They took a 75 MW site from land survey to grid synchronisation in under eleven months, and the generation has tracked the P50 model every quarter since.
IPHead of ProjectsIndependent power producer, Hyderabad
Our plant ran through the entire build without losing a single production shift. The crew worked around our shutdown windows instead of asking us to work around theirs.
ACPlant DirectorAuto components manufacturer, Pune
The lender's engineer cleared their design pack with no material observations. That alone saved us a full financing cycle.
TGChief Financial OfficerTextile group, Coimbatore

Let’s size the plant your site can actually carry.

Send us your load profile, tariff and site coordinates. You’ll get a yield model, a capacity recommendation and an indicative tariff within five working days — at no cost.